Home automation system for energy management
ABB I-BUS® EIB / KNX
ABB STOTZ-KONTAKT
During the planning and construction phase of a new building, keeping to
the planned building costs often becomes an issue. Nobody seems, however, to be looking at the future operating costs although, according to a study produced by A.T. Kearney, these can be up to 20% of the construction cost each year. This percentage generally rises as a result of
increasing flexible use requirements. On average, operating costs have exceeded investment costs after seven years.








