Ceramic facade cladding
FV 2
butech
Edival building in Valencia
PHASES OF ASSEMBLY OF THE SYSTEM
1. Modulation of the facade: determining the exact position of
the pieces and of perfilería necessary according to planes and fixation of
perfilería.
2. Positioning of the heat insulation.
3. Positioning of the joined pieces of Ston-Ker by means of subjection
mechanics and chemistry.
4. Positioning of the pieces of Ston-Ker by means of mechanical subjection
and chemistry in closings of windows.
PHASES OF ASSEMBLY OF THE SYSTEM
1. Modulation of the facade: determining the exact position of
the pieces and of perfilería necessary according to planes and fixation of
perfilería.
2. Positioning of the heat insulation.
3. Positioning of the joined pieces of Ston-Ker by means of subjection
mechanics and chemistry.
4. Positioning of the pieces of Ston-Ker by means of mechanical subjection
and chemistry in closings of windows.
-