Reinforced concrete hollow core deck slab
GLF 18/60
Echo
The savings of time obtained with the installation save from 1 to 2 days of hand-of œ uvre
The flagstones are posed without stays, which is preferable for themedical one and the obstruction of the building sites (50 stays for 100m2 on average). The aesthetic aspect in basement, the facility of handling, the possibility of borings, a thickness identical from 0,50 to 6,00 meters, a single order by floor, the guarantee of an execution prefabricated in factory, the control of the cost constitute the principal arguments of the choice.
Among the latter, appears also the grutage by the proper services ECHO and, for a pavillonnor regular user, the installation and keying in the half-day.
Alveolate flagstones out of prestressed concrete with lower face smoothes VSF 18/60
Any knowledge on the alveolate prestressed concrete flagstones with smooth lower face








