Approx. 40 tons of steel profiles were used for the construction. The glass pyramids have been executed without visible structural steel sections on the inside and without pressure beads outside in order to obtain the required all-glass crystal look.
During the day the Kapipane membrane hides the red foil from the outside and the facade takes on a neutral colour. At night, when lit up from the inside, the red colour of the Citroen brand is visible
Scope of Work
Approx. 900 sqm curtain wall