Precast micro-pile
Novatek s.r.l.
Generally, in all these cases, suitable foundations have to be installed (consisting in adequately sized plinths).
To do this, it is necessary to break up the existing floor, remove earth, install reinforcements and cast concrete.
These are invasive procedures and are not always easy to carry out within an existing structure. By simply installing pressure driven mini piles, Novatek is able to increase the load bearing capacity of a normal industrial floor so that it is able to support the new required loads. Machinery weighing hundreds of tonnes no longer requires a huge base which takes a long time to create and is highly invasive. All you need to do is install a series of mini piles whose layout and capacity is designed and calculated according to your specific requirements. The absolute reliability and safety of the process is guaranteed by the fact that the effective load bearing capacity of the mini piles is individually tested and certified.