Steel driven pile
Novatek s.r.l.
These elements are installed in sequence and secured together using a pressed coupling. The hydraulic jack is equipped with a gauge, which indicates the pressure required to drive the steel-cement piles into the soil. Therefore, the load of each mini pile is tested individually. When the mini pile reaches a stratigraphic formation which allows it to resist the desired drive force (which can vary from a minimum of 8,000 kg to a maximum 12,000 kg) the jack is removed and the MP/50 MINI PILE is internally and finally cemented into the foundation. Considering the reduced dimensions of the mini piles, the holes do not weaken the foundation and the foundation does not need to be reinforced in terms of dimensions and structural rigidity. The mini piles are easy to install using machines requiring little clearance, which can also access cellars and confined spaces in general.