• Products
  • Catalogs
  • News & Trends
  • Exhibitions

Stick system curtain wall TOUR FIRST
metal and glasswith integrated insulation

stick system curtain wall
stick system curtain wall
stick system curtain wall
stick system curtain wall
stick system curtain wall
stick system curtain wall
stick system curtain wall
Add to favorites
Compare this product
 

Characteristics

Type
stick system
Construction
metal and glass
Options
with integrated insulation

Description

Project Feature The First Tower, which has become the new flagship building of La Défense, meets environmental criteria and has obtained all qualifications and certifications. Its exemplary character in this field has marked the beginning of a new era in the design of highrise buildings in France. In this context, the façade has played a fundamental role in achieving quality objectives. It is a bio-climatic façade, in the true sense of the word. In fact, each component has been treated differently according to its exposure and its role, area by area, within the building. Therefore, entire sections of the façade have been treated as ventilated dual-skins serving as heat shields. Moreover, low emission glass has also been used. Such performance has made a major contribution to reducing energy consumption from 400 to 100 KWh/m²/year and CO² emissions from 37 to 13 kg/m²/year. CTBUH Best Tall Building Award Europe Nominee 2011. Scope of Work 41,300 sqm (444,500 sq ft) of curtain wall.

Other Permasteelisa products

Architectural Envelopes

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.