Sapa building system
Group: Sapa
  • Products

Aluminium profile for mullion and transom curtain wall
ELEGANCE 52 ST sapa building system

Thermally separate front
Opinion width: Post and latch plate 52 mm
Mounting methods:
a) Post and beam construction method: Installation of the latch plates between posts already installed.
b) Precast construction method: Assembly of the prefabricated elements by means of assembly posts.
Glazing: 8 - 50 mm of drying glazing with EPDM seals
Drainage: Alternatively as latch plate post drainage or drainage by field
Thermal separation: Damming profile from special PVC
Connections: Latch plate post connections by means of direct screw connection or with specially t link
Processing: The post profiles are not released within the latch plate range. Hollow chamber for the admission of properly matching liaison vehicles.
Statics: Different Pfosten-und of latch plate profiles for different static
  • zoom
See the translation



standListOtherProduct www ae En 2012-02-07-13