Large two-storey primary school previously hired to support a DfE decant education project for a 2½ year hire.
Layout includes reception classrooms (x4), nursery, SEN rooms, classrooms Yrs. 1-4, primary toilets and staff facilities.
Dimensions: 77.8m x 19.9m
Number of modules: 100
Overall size: 3,096m²
All-steel construction.
Manufactured to have a design life of 60 years.
Great saving on £ per m2 compared to brand new, without sacrificing quality.
Fully redecorated (internally and externally), with additional layout changes available at an additional cost.
Meet the relevant Building Control requirements.
Providing a comfortable environment.
The Finer Details:
20 General Classrooms
Staff and Student Toilet Blocks on both floors
Head Master Office, Staff Room and Hygiene Rooms
Multiple Stairwells
Large Group and Nursery Playrooms