video corpo

Building metallic structure UNILEVER BESAN FACTORY
galvanised steel

Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel
Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel
Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel - image - 2
Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel - image - 3
Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel - image - 4
Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel - image - 5
Building metallic structure - UNILEVER BESAN FACTORY - APEC Smart Steel Structures - galvanised steel - image - 6
Add to favorites
Compare this product

Characteristics

Applications
for building
Options
galvanised steel

Description

Location Istanbul Construction Year 2015 Indoor Space 2.200 m² Due to APEC’s simpler and quicker installation compared to conventional steel structures, Unilever chose APEC Smart Steel Structure Systems to renew its Besan Factory. The existing storage unit has been replaced with a new one with steel structures, which has a 26 m width, 7.5 m height and 2,200 m² indoor space. It has been completed in seven days.

Catalogs

No catalogs are available for this product.

See all of APEC Smart Steel Structures‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.