1. Kitchen & Bathroom
  2. Bathrooms
  3. Round bathtub
  4. Fire Ice Systemtec Georg Zelger e.K.

Round bathtub Dip Rondo 125
integratedprofessionalpolyester

Round bathtub - Dip Rondo 125 - Fire Ice Systemtec Georg Zelger e.K. - integrated / professional / polyester
Round bathtub - Dip Rondo 125 - Fire Ice Systemtec Georg Zelger e.K. - integrated / professional / polyester
Round bathtub - Dip Rondo 125 - Fire Ice Systemtec Georg Zelger e.K. - integrated / professional / polyester - image - 2
Round bathtub - Dip Rondo 125 - Fire Ice Systemtec Georg Zelger e.K. - integrated / professional / polyester - image - 3
Round bathtub - Dip Rondo 125 - Fire Ice Systemtec Georg Zelger e.K. - integrated / professional / polyester - image - 4
Round bathtub - Dip Rondo 125 - Fire Ice Systemtec Georg Zelger e.K. - integrated / professional / polyester - image - 5
Add to favorites
Compare this product

Characteristics

Configuration
round
Installation
integrated
Use
professional
Material
polyester
Style
contemporary
Options
deep
Color
white, blue
Length

215 cm
(84.6 in)

Width

210 cm
(82.7 in)

Height

125 cm
(49.21 in)

Weight

115 kg
(254 lb)

Description

Round version made of polyester with 4-step access, steps and bottom Steps and bottom with anti-slip profile, with overflow channel at the front, Stainless steel handrail, white, adjustable support frame, floor drain rg 1 1/2" with white cover and drain socket d 63 with siphon in the Gutter. External dimensions: l x w: 215 x 210 cm clear depth: 125 cm Filling capacity: 1.680 l Weight: 115 kg Basin installation: The Mini 75, Maxi 110 and Rondo 125 models are equipped with self-supporting walls Walls, so that a complete encasement of the pool is not necessary is not necessary. To install, proceed as follows: - A flat concrete slab is prepared for the sauna plunge pool. Dimensions: as the upper edge of the pool. Attention: Provide a recess for the floor drain for Mini 75 and Maxi 110 (width: 25 cm). - Set up and align the pool, backfill if necessary - Connect piping - Fill the basin halfway with water - Underpin steps and trough with columns (for Rondo 125, insert and adjust and adjust). - Set the upper edge of the pool into the floor. The plunge pools can also be backfilled with lean concrete. In in this case, the concrete and water must be filled in slowly and evenly so that pressure equalization takes place.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.