The “baby” among the GEDA transport platforms features a range of benefits. When folded, the GEDA 300 Z/ZP is only 0.85 m wide, allowing easy transport to the construction site – even through narrow driveways. With the convenient fork lift pockets, the complete device can easily be transported with a pallet truck or fork lift truck.
Once at the construction site, the GEDA 300 Z/ZP reveals its true size: its compact 1.35 x 0.95 m platform and the flat cable bin can be set up even on the narrowest pavements and in the smallest courtyards.
The two separate controls quickly turn the material hoist into a transport platform which is also approved for transporting up to three passengers.
In addition to the 400 V model, the device is also available as a 230 V version. The 230 V hoist can simply be connected to the existing power supply without requiring a separate high-voltage connection. This is often a great advantage, especially when renovating older buildings.
GEDA UNI-X-MAST System
An ingenious system: can be used on all GEDA rack and pinion hoists from 300 kg to 2,200 kg load capacity.
GEDA Corrosion Protection
The new GEDA all-round protection provides protection from corrosion and its consequential damage, maintains the functionality of components and extends their operating life.
Automatic lubrication device standard
The automatic lubrication system reduces maintenance costs.
Cargo - Persons and material
Mast system - GEDA UNI-X-MAST
Load capacity (material) - 500 kg
Load capacity (persons) - 3 Persons
Lifting height - 50 m
Lifting speed - 12 m/min
Power supply - 1.9 kW / 400 V / 50 Hz / 16 A
Platform dimension - 0.95 m x 1.35 m x 1.1 m / 1.8 m