The permanently installed GEDA 1200 ZP P transport platform is the strong and versatile partner for heavy loads and efficient working. People and materials are conveyed quickly, but primarily safely, upwards and downwards.
Its wide range of industrial applications include asphalt mixing systems, power stations, cement works, chemical plants as well as in the warehousing and logistics sector.
The flexible system enables the GEDA 1200 ZP P transport platform to adapt to individual customer requirements and on-site conditions. Therefore in addition to the three different speed variants, there is also an extensive range of platform versions. The highlight of the GEDA 1200 ZP P transport platform is that despite the high load capacity of 1500 kg it is guided on only one mast which only requires low anchoring forces on the façade or on the scaffolding construction.
GEDA Corrosion Protection
The new GEDA all-round protection provides protection from corrosion and its consequential damage, maintains the functionality of components and extends their operating life.
Automatic lubrication device standard
The automatic lubrication system reduces maintenance costs.
Cargo - Persons and material
Mast system - GEDA VARIO-MAST
Load capacity (material) - 1500 kg
Load capacity (persons) - 7 Persons
Lifting height - 130 m
Lifting speed - 9 m/min / 12 m/min / 24 m/min
Power supply - 2 x 3 kW / 400 V / 50 Hz / 32 A