Arkad Concrete Raised Floors Formwork system, in accordance with the principle of minimum cost and maximum benefit, which constitutes the basic values of lean construction, in new or renovated residences and workplaces, offices, business and shopping centers, mechanical and electrical cable trays, plumbing pipes under the screed. It is a concrete and reinforced concrete raised floor system with high load carrying capacity, allowing passage by creating gaps. It is a cost-effective and time-saving raised floor solution that can be used under screed in buildings, produced from recycled plastics that can be adjusted to the desired height, with a minimum of 8.5 cm without feet and 12 cm with feet.
Usage Areas
Control rooms
Data centers
Office buildings
Shopping malls
Airport terminals
Train stations
Bus terminals
Ship Port/ports,
In hospitals, universities and residences
Advantages
It offers construction stakeholders speed, simplicity and cost performance in construction.
Requires less storage space on site.
Does not require skilled labor.
One worker can assemble 100 m2 formwork per hour
Mechanical, electrical and sewage installations can be easily passed through the created space.
It allows easy intervention with junction boxes to be placed.
The cavity provides sound and heat insulation.
It is more economical than other raised systems with metal or plastic legs.