( 1 ) Bulkhead walkway and walls are made of SMC through compression molding should be white With high intensity and corrosion resistance. The pre-built holes for installing starting block are equipped on the surface of bulkhead
( 2) Bulkhead inner truss structured With 304 stainless steel profiles is easy to assemble. The original pool structure and ceramic tiles will not be broken during the installation
( 3 ) Both Sides of the bulkhead are equipped With FINA standard black or blue cross Shape lane mark and rope hooker. Each square meter of the wall can withstand 5001<0 of force and the wall can be installed a variety of specifications of t5e timing device ,
( 4 ) Control the movement of the bulkhead by inflating and exhausting air through the compressed air pipe
( 5 ) The fixed position of the movable bulkhead can be adjusted to the lenqth of the FINA standard competition pool. The terminal is equipped With anti-collision device to avoid improper operation when movina and colliding With pool tiles or underwater observation Windows and ofher devices ,
( 6) The non-competition side of the partition wall is equipped With optional guardrail to protect referees and pedestrians. The height of the guardrail should be 1.2m.
Specification
25m in length * Im in width * 1.3m in height. 300mm above the surface of water.