2009/2010
Date built
30 Wochen
Construction time
666.40 m²
Built-up area
8,759.00 m³
Building volume
Low energy residence in Ternitz
4 two-level-double houses with < 18kWh/m²a energy consumption.
This VARIO-HAUS reaches super-low energy standard, surpassing the requirements of the Austrian housing subsidies
Built in timber frame construction in our plant in Wr. Neustadt, Austria.
Plenty of room outside on the terrace on the ground floor
Natural, friendly look with wood paneling of the facade
Commercial construction / B2B for public and private property developers and town councils