The Super-Slab® System places precast slabs directly upon a fully engineered subgrade surface that provides nearly complete slab support immediately upon installation.
After the slabs have been placed, they are structurally interlocked with a unique grouted load transfer system. Complete slab support is achieved when bedding grout is pumped into a bedding grout distribution system that is cast into the bottom of the slabs.
Super-Slab® is used for continuous and intermittent
pavement replacement. Slabs are precisely cast to fit curved and superelevated geometry specific to each location. This feature makes it possible to replace entire mainlines, ramps,
intersections and even crosswalks in a series of 8 hour (or less) roadway closures.
Fort Miller provides the engineering, specialized forming and grading equipment and on-site installation training required to make this happen in your state.