Construction of a 330m² climbing hall and 80m² changing rooms in timber construction. The hall is built on the basis of a glue-laminated timber frame with wall filling and timber frame boxes.
The peripheral exterior cladding is wood and laminated panelling, including metal finish flashings and exterior joinery.