Concrete manhole COMBINED PUMP & VALVE CHAMBER

concrete manhole
concrete manhole
concrete manhole
concrete manhole
concrete manhole
Add to favorites
Compare this product
 

Characteristics

Material
concrete

Description

A partnership between Marshalls CPM’s off-site solutions team and contractors, NMC Nomenca has developed a combined pump and valve chamber by utilising Marshalls CPM’s caisson shaft system. The valve chamber is incorporated into the top two meters of the shaft, thereby reducing the overall footprint of the project and considerable savings in time and cost. The combined pump and valve chamber system is available in 3000mm, 3660mm, and 4000mm diameter depending upon the valve and pipe work requirements.

Catalogs

No catalogs are available for this product.

See all of CPM Group Ltd ‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.