Concrete manhole FLOW CONTROL CHAMBERS

Concrete manhole - FLOW CONTROL CHAMBERS - CPM Group Ltd
Concrete manhole - FLOW CONTROL CHAMBERS - CPM Group Ltd
Concrete manhole - FLOW CONTROL CHAMBERS - CPM Group Ltd  - image - 2
Concrete manhole - FLOW CONTROL CHAMBERS - CPM Group Ltd  - image - 3
Concrete manhole - FLOW CONTROL CHAMBERS - CPM Group Ltd  - image - 4
Concrete manhole - FLOW CONTROL CHAMBERS - CPM Group Ltd  - image - 5
Add to favorites
Compare this product
 

Characteristics

Material
concrete
Width

1,200 mm
(47 in)

Description

Marshalls CPM has designed this off site solution precast chamber to accommodate a requirement for control stormwater events at different peak levels i.e. 1 in 20 or 1 in 50 year storm events etc. To control these storm events the concrete chamber can be pre-fitted with a Hydro-Brake Optimum®, Hydro-Brake® or Orifice plate on either a headwall or weir wall. Marshalls CPM in an innovative joint venture with Hydro International has introduced a series of easy to install pre-formed Hydro-Brake® chambers that incorporates a pre-fitted Hydro-Brake® or Hydro-Brake Optimum®. This chamber has been designed to enable the contractor to install the flow control chambers in a fraction of the time it takes using conventional methods. Marshalls CPM has a comprehensive range of chambers to suit most flow control chamber requirements, with a range that starts from 1200mm up to 4000mmm diameter.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.