• Products
  • Catalogs
  • News & Trends
  • Exhibitions

Driven pile CASED AUGER
reinforced concretefoundation

Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation
Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation
Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation - image - 2
Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation - image - 3
Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation - image - 4
Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation - image - 5
Driven pile - CASED AUGER - FRANKI FOUNDATIONS BELGIUM - reinforced concrete / foundation - image - 6
Add to favorites
Compare this product

Characteristics

Type
driven
Material
reinforced concrete
Applications
foundation

Description

A cased auger pile is formed using the twin rotary-drive system (also called ‘FoW’ or Front of Wall system), with extraction of soil under a temporary casing. The system is particularly suitable for the manufacturing of a pile wall (secant pile wall, tangent pile wall, contiguous independent piles). The execution is vibration-free and with limited noise pollution. The reinforcement is placed after the concreting phase. Construction sequence 1. Positioning of the auger housed inside a steel drill casing. The auger and the casing are mounted on two independent, superimposed rotary heads rotating in opposite directions. 2. Auger and casing are simultaneously screwed into the soil, but rotate in opposite directions. Closing of the sealing flap fixed at the bottom of the auger prevents any infiltration of water and/or soil into the hollow, central axis of the auger during the screwing-in phase. 3. Lowering of auger and casing to the designed depth. The soil which is loosened at the auger tip is conveyed to the surface by the auger flights inside of the casing. 4. Discharge of the excavated soil through openings located at the top of the casing, underneath the rotary drive. Opening of the closing flap. Pouring of concrete through the hollow stem of the auger as auger and casing are simultaneously withdrawn and formation of the pile shaft. 5. Placement of the reinforcement cage in the freshly concreted pile 6. Finished cased auger pile Possibility of continuous registration of the installation parameters in order to monitor the quality of the execution process.
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.