Reinforced concrete bridge FARMINGTON/HOOK
precast concretebeamroad

reinforced concrete bridge
reinforced concrete bridge
reinforced concrete bridge
reinforced concrete bridge
Add to favorites
Compare this product
 

Characteristics

Material
reinforced concrete, precast concrete
*type
beam
Application
road

Description

The driving force behind selecting the SpaanSpan® bridge system for two 2-span bridges over the New York State Thruway near Rochester, NY was to increase the under clearance to 5.0m. High performance concrete with pre-tensioned slabs and a post-tensioned finished structure provided the owner with a low maintenance, highly durable precast concrete solution. The precast components for each span were erected in two days and the entire bridge was replaced in three months. Two spans at 100’ each combined with a structural depth of less than 21” minimized the need to significantly alter the approaches to the bridge. The architectural details of the ashlar stone formliner finish were carried from the precast bridge units to the abutments and center pier.

Catalogs

No catalogs are available for this product.

See all of The Fort Miller Co.‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.