Precast concrete bridge ROUTE 159
prestressed concretebeamroad

precast concrete bridge
precast concrete bridge
precast concrete bridge
precast concrete bridge
Add to favorites
Compare this product
 

Characteristics

Material
precast concrete, prestressed concrete
*type
beam
Application
road
Length

130'00"
(40 m)

Description

The driving force behind selecting the SpaanSpan® bridge system for the Route 159 bridge over the CSX Railroad in Rotterdam, NY was to increase the under clearance for the railroad without increasing the profile of the approaches. High performance concrete with strengths in excess of 10,000 psi, pre-tensioned slabs and a post-tensioned finished structure provided the owner with a low maintenance, highly durable, precast concrete solution. This project marks the first time the NYSDOT utilized the SpaanSpan® system. The 130 ft span was accomplished with a minimal structural depth of approximately 21”. Precast, pre-tensioned deck slab units were placed between and supported by the longitudinal edge girders. Temporary bracing and support falsework is also shown. The longitudinal edge girders were spliced over the active tracks to provide a completed span of 130 ft. Spliced girders were used to facilitate shipping and jobsite erection.

Catalogs

No catalogs are available for this product.

See all of The Fort Miller Co.‘s catalogs
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.