With UNO, walls and columns, slabs and beams as well as stairways are shuttered simultaneously and concreted using the monolithic construction method. UNO is therefore a cost-effective solution for forming social residential buildings featuring frequently repetitive floor plans. The aluminum elements are prefabricated on a project-specific basis and can be assembled without the use of a crane.
Efficient working procedures
with lightweight elements, ingenious technology and very few accessory components
Innovative anchoring technology
with reusable anchors that are installed on one side and up to 70 % fewer anchor points than comparable systems
Fast striking
with an ingenious transition between wall and slab formwork as well as the Drophead which allows early striking
For wall thicknesses from 8 cm to 30 cm and slab thicknesses up to 30 cm
Permissible fresh concrete pressure: 80 kN/m² (hydrostatic)
Crane-independent working operations using lightweight aluminium elements which are also easy to clean
Very tight panel connections through the Wedge Coupler
Conical ties without spacer tubes, installed from one side only
Simple striking of the walls due to the Spacer Coupler
Early striking of the slab with the Drophead; as an option, panels can be directly supported