Stone drainage channel CANIVEAU CC2
paving

Stone drainage channel - CANIVEAU CC2 - REPLIK - paving
Stone drainage channel - CANIVEAU CC2 - REPLIK - paving
Stone drainage channel - CANIVEAU CC2 - REPLIK - paving - image - 2
Stone drainage channel - CANIVEAU CC2 - REPLIK - paving - image - 3
Stone drainage channel - CANIVEAU CC2 - REPLIK - paving - image - 4
Stone drainage channel - CANIVEAU CC2 - REPLIK - paving - image - 5
Stone drainage channel - CANIVEAU CC2 - REPLIK - paving - image - 6
Add to favorites
Compare this product

Characteristics

Material
stone
Applications
paving
Length

500 mm
(20 in)

Width

500 mm
(20 in)

Depth

Max.: 135 mm
(5.31 in)

Min.: 110 mm
(4.33 in)

Description

Description
  • Channel drain CC2 50×50
  • Finish: stone-cut / aged stone appearance


Sales unit
  • Sales unit (U) = linear metre (ml)
  • Equivalence: 1 ml = 2 channel drains


Geometric characteristics
  • Length: 50 cm
  • Width: 50 cm
  • Thickness: 13.5 - 11 cm
  • Weight: 164 kg / U
  • Packing: 10 U / pallet (disposable pallet 110×90)


Installation
  • The indications given by standard NF P 98 335 and CCTG booklet 29 take precedence.
  • Installation should be carried out between +5°C and +30°C on a sound substrate.
  • Mortars are prepared or supplied as the work progresses.
  • The mortar bed is levelled with a straightedge and executed in sequence. Its thickness should be as uniform as possible (~4 cm).
  • Panels must be moistened, especially in hot conditions.
  • During installation, blend products of different colours/shades coming from different batches.
  • Joints are provided between the slabs. Joints are filled with mortar no sooner than 24 h after laying and no later than 72 h after laying.
  • Joint width should be as small as possible without being less than 5 mm.
  • Immediately after jointing, the surface must be cleaned to avoid any film or deposit on the slabs.
  • Movement joints must be provided in accordance with regulatory requirements (10 linear metres or 20 m²).


Maintenance
  • Original colours are very stable; minimal maintenance is generally sufficient.
  • Applying a mineralising treatment will facilitate cleaning operations and extend the life of the original surface appearance.
  • High-pressure cleaners or acidic products are not recommended, as they can cause irreversible alterations.
  • De-icing salts should be used in reasonable quantities, avoiding excess stagnant residues.


Technical characteristics / specifications
  • Splitting strength: 5.2 MPa
  • Water absorption: < 6 %
  • Freeze/thaw resistance: 0.758 kg/m²
  • Slip resistance: medium 62
  • Regulatory framework: NF – EN – 1340
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.