OverviewSwan pedestrian bridges feature a Swan-style railing system in Corten steel or powder-coated steel (custom RAL colours). Railing infill is available as continuous stainless-steel cables or Corten mesh panels. A rounded handrail in wood or stainless steel completes the profile. Curved Corten panels run along the load-bearing structure to reduce climbability. Bridges are supplied largely prefabricated to minimise on-site assembly time.
Key features- Railing options: Corten steel or powder-coated steel (RAL).
- Handrail options: round wood or stainless steel.
- Infill options: full-length stainless steel cables or Corten mesh panels.
- Curved Corten side panels integrated with the structure for reduced climbability.
- Prefabricated delivery for short on-site installation times.
Dimensions & loads- Maximum recommended span: 16 m.
- Standard widths: 2 m or 3 m.
- Maximum uniformly distributed load: 5 kN/m² (≈ 90 lbs/ft²).
Bridge process (summary)Streetlife follows a six-step process from concept to completion: concept → design drawings → drawing approval → prefabrication → delivery → on-site assembly. Typical lead time: 12–14 weeks after drawing approval. Prefabrication minimises on-site assembly time.
MaterialsCorten steelMaterial: weathering steel
Colour: warm red-brown
Texture: rough
Oxidation time: 1–3 years
Lifespan: approx. 50 years
Maintenance: none
Recyclable: yes
Powder coatingFinish: two-coat powder coating
Substrate: steel / aluminium / Corten / galvanised steel (depending on configuration)
Colour: RAL (customisable)
Texture: smooth
Lifespan: approx. 10 years (depending on environment)
Maintenance: minimal cleaning recommended
Recyclable: yes
Technical specifications- Model: Swan
- Main structure and railing: Corten steel or powder-coated steel (RAL)
- Handrail: wood or stainless steel
- Infill: stainless steel cables or Corten mesh panels
- Maximum span: 16 m
- Standard widths: 2 m, 3 m
- Design load: 5 kN/m²
- Manufacturing & delivery: largely prefabricated; typical lead time 12–14 weeks after drawing approval
- On-site installation: typically a few days due to prefabrication