Exchange of the curtain wall logo on the Commerzbank Tower.
Three curtain wall logos had to be exchanged at heights of 197 and 208 m. For this reason the glass panes had to be removed in this area by means of a cradle system and hoisting device, and all point fixings had to be replaced.
Scope of Work
Glazing: approx. 200 sqm (2,200 sq ft) laminated glass